Residential Contractors

(843) 846 - 2500

Campbell Residence: June 2007

Click on the photos to see an enlargement.



June 28, 2007 -- Today work begins on the road to Campbell's lot. This should take only a day or two. Work on the structure will begin very soon.


June 28, 2007 -- This is where the road will run. It will be between the (barely visible) yellow flags in the center of the photo to the brush on the right. A couple of hundred feet up, it turns right through the brush.


June 28, 2007 -- The crews will use heavy equipment, yet be very mindful of the natural surroundings here.


June 28, 2007 -- The road to Campbells is being cleared. Permits will be pulled in a day or two and work will begin.


June 28, 2007 -- Road work will take a couple of days to finish. Several loads of fill dirt will be brought in to make the road passable in rainy weather.


June 28, 2007 -- The lot location is very rustic. It is tucked in a wooded area between two golf fairways. The road to reach it runs along the edge of a fairway and then winds through the woods.