November 7, 2007 -- The deck railing has been painted. A walkway will be built between the storage room and the walk to the cottage.


November 7, 2007 -- The view out the double doors over the deck is very nice. The right door is not open.


November 7, 2007 -- This is the lake view of the garage. The right door goes upstairs to the apartment. The left door goes to the garage.


November 16, 2007 -- The garage is enhanced by the new landscaping. There is a turn around on the left. The driveway will be filled with gravel.


November 16, 2007 -- Now there is a brick walk from the storage room to the connecting sidewalk. There is a cast iron boot rack on the storage room porch.


November 16, 2007 -- This is the garage as viewed from the front porch.


November 29, 2007 -- A nice curved brick walkway has been built from the storage room to the driveway.


November 30, 2007 -- The stairs have been painted and stained. They also have a sealer coat on them. The handrails still have blue masking tape on them.


November 30, 2007 -- There is a wood floor at the foot of the stairs inside. Outside, there is a brick stoop and walk leading to the cottage.