Gitlitz Cottage: September 2007
September 6, 2007 -- The hurricane fabric is temporarily installed on the windows. It is heavy material similar to trampoline material.
September 6, 2007 -- Although the hurricane fabric is difficult to see through from the outside, it is not difficult to see through if you are on the inside. It is in place on the windows and doors in this photo.
September 6, 2007 -- The tub is in place in the master bath room. The plumbing is basically finished except for the kitchen.
September 6, 2007 -- The master shower plumbing is nearly complete. The shower will have a glass door installed soon.
September 12, 2007 -- The rear deck is screened. The floor has finish applied to it. Fans and lights will be installed on the back porch soon.
September 26, 2007 -- The front yard is being landscaped to keep water away from the front steps. You can see the catch basin right on the shadow line in front of the steps.
- Click Here to return to the Past Projects Page
- [Home]
- [News]
- [Past Projects]
- [Campbell]
- [Causey]
- [Elloree]
- [Gitlitz Cottage]
- [Oct 06]
- [Nov 06]
- [Dec 06]
- [Jan 07]
- [Feb 07]
- [Mar 07]
- [Apr 07]
- [May 07]
- [Jun 07]
- [Jul 07]
- [Aug 07]
- [Sep 07]
- [Oct 07]
- [Nov 07]
- [Gitlitz Garage]
- [Griffin]
- [Groman]
- [Historic]
- [Hoats]
- [Keller]
- [Kumar]
- [Langford]
- [Lord]
- [Lowcountry Plantation]
- [McCormack]
- [McNeil]
- [Ponds]
- [Rizer]
- [Schuld]
- [Weiss]
- [Select A Builder]
- [Services]
- [FAQ]
- [Contact Us]
- [About Us]
- [Testimonials]
Copyright, 2009, Ponds & Sons Construction Company, Inc. dba Ponds & Sons