Residential Contractors

(843) 846 - 2500

Groman Residence: August 2008

August 12, 2008 -- There are grade beams below the slab for extra support. The plumbing pipes will be sleeved before the grade beams are poured. An electrical box is in the background.
Click Here to return to Groman Residence: August 2008