Groman Residence: August 2008
|
August 15, 2008 -- Steel mesh is being put down. Notice the rebar is bent over the mesh. The pipes have foam around them to protect them from abrasion from the concrete. The septic drain can be seen in the lower right corner of the photo. |
|
Click
Here to return to Groman Residence: August 2008