Groman Residence: October 2008
|
October 20, 2008 -- The threaded rods are being installed in the house. They are epoxyed into the concrete foundation and go through the top plate. There is a 3" square washer on the top to insure the nuts don't pull through the plate. |
|
Click
Here to return to Groman Residence: October 2008