Residential Contractors

(843) 846 - 2500

Groman Residence: October 2008

October 21, 2008 -- The electrical boxes are all in place. Wires are being pulled. The steel tie down rods are being placed. They go from the foundation to the top plate. Each one is a 5/8" steel rod. The house will have about sixty of them.
Click Here to return to Groman Residence: October 2008