Groman Residence: November 2008
November 17, 2008 -- The screened porch steps were built on Friday. There will be a 7 1/2 by 13 foot tabby concrete terrace at the foot of these steps. |
Click Here to return to Groman Residence: November 2008
November 17, 2008 -- The screened porch steps were built on Friday. There will be a 7 1/2 by 13 foot tabby concrete terrace at the foot of these steps. |