Residential Contractors

(843) 846 - 2500

Keller Residence: February 2008

Click on the photos to see an enlargement.




February 7, 2008 -- The soaking tub is installed in the master bathroom. On the right, the mirror needs to be hung.


February 7, 2008 -- A cast iron laundry sink is installed in the laundry room.


February 7, 2008 -- A combination dog bed and storage cabinet is now in the side hallway.


February 7, 2008 -- The bathrooms upstairs have pedestal sinks. This is the bath off the northern bedroom.


February 7, 2008 -- The Brays Room looks very big from the balcony. The mantle location is outlined in masking tape around the fireplace.


February 12, 2008 -- A fence is being built around the HVAC & electrical equipment. The siding lap matches the house.


February 12, 2008 -- The new and improved post layout for the breezeway steps.


February 12, 2008 -- The dog fence was installed today. This view is from the breezeway.


February 12, 2008 -- Another view of the dog fence from the rear of the house. It will be painted dark brown soon.