Lord Residence: December 2008
December 24, 2008 -- The service yard and owner's walk have been poured now with tabby concrete. There will be a brick border installed around the perimeter. |
Click Here to return to Lord Residence: December 2008
December 24, 2008 -- The service yard and owner's walk have been poured now with tabby concrete. There will be a brick border installed around the perimeter. |