Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: September 2007

September 6, 2007 -- The patio block is in place. The inside is filled with packed fill material. Flashing will be placed next to the house and the slab will be poured this afternoon.
Click Here to return to McNeil Log Cabin: September 2007