Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: December 2007

December 14, 2007 -- The air conditioning ducting is being installed. In the next day or two an air handlers will be installed in the attic for the second floor. The downstairs air handler will be under the steps.
Click Here to return to McNeil Log Cabin: December 2007