Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: October 2007

Click on the photos to see an enlargement.



October 22, 2007 -- The brick wall has been modified to have two lower levels at each end. A blue stone will cap the wall soon.


October 22, 2007 -- The bay window has been framed and sided. It is in the master bedroom.


October 22, 2007 -- The fireplace and chimney have been boxed in. It will have trim on the outside corners.


October 24, 2007 -- The bay window now has trim around it. The house will have trim on it just above the porch.


October 24, 2007 -- The fireplace intrusion on the porch is now also trimmed.