January 2, 2007 -- Exterior trim really dresses up the house.


January 3, 2007 -- The slab for the hot tub was poured late last year.


January 5, 2007 -- Vents are trimmed and installed.


January 5, 2007 -- The crown molding really dresses up the frieze and soffit profile.


January 17, 2007 -- The chimney is started. Brick will be interleaved to go around the house.


January 17, 2007 -- A view of the north end of the house showing exterior trim and copper flashing.


January 19, 2007 -- Copper flashing looks very nice.


January 19, 2007 -- An inside view of the chimney. notice the fresh air intake on the left side.


January 19, 2007 -- A view of the chimney from the rear porch.


January 23, 2007 -- The chimney is going up on the outside.


January 23, 2007 -- The drive through arch is trimmed.


January 23, 2007 -- Exterior siding has begun.


January 24, 2007 -- The chimney is going up on the inside. The wooden beam is a placeholder for the stone mantle.


January 24, 2007 -- The drive through arch looks very nice with siding and trim.


January 24, 2007 -- Another view of the siding showing a couple of windows and part of the arch.


January 25, 2007 -- An outside view of the chimney.


January 25, 2007 -- Inside, the chimney is nearly to the ceiling.


January 29, 2007 -- The chimney is necked down on the outside.


January 29, 2007 -- The brick work on the chimney is at the ceiling level.