Schuld Residence: June 2007



June 1, 2007 -- The kitchen floor tile is nearly complete. It will be grouted tomorrow.


June 4, 2007 -- The kitchen tile is finished. It was grouted over the weekend. Wood flooring will be installed where there is no tile.


June 4, 2007 -- Baseboard is also being installed. It is off the floor because the wood flooring will go under it.


June 5, 2007 -- The walls are being painted inside. This is the living room. The windows look hazy because they have plastic taped over them to protect them from overspray.


June 5, 2007 -- This is the train room (over the double car garage). The walls are painted a light blue.


June 5, 2007 -- Tile was installed in the master bath room. The frame in the back is for the master bath tub.


June 7, 2007 -- The upstairs bathrooms are getting tile installed on the floor and wall.


June 7, 2007 -- The house has a 600 amp service. These are the entrance boxes as well as the meter base.


June 11, 2007 -- The bathrooms have tile on the wall and floor. They need to be grouted yet.


June 11, 2007 -- Another bath tub has tile along the wall. The red color on the walls is red guard, a water proofing.


June 11, 2007 -- This tile also needs to be grouted.


June 11, 2007 -- The master bath drops into the opening. It has decorative tile around the wall.


June 11, 2007 -- This is a close up of the tile along the wall in the master bath room. The tub will go in the opening in the lower right corner of the photo.


June 13, 2007 -- This is the tile in the laundry room. The washer and dryer will go on the solid black area on the right.


June 13, 2007 -- The breaker boxes are wired. Only a few spaces are left over. Temporary power will be on soon.


June 14, 2007 -- The hallway outside the laundry room has tile now. The dull spot in the center of the bottom of the photo is plastic (you can see the green tape holding it).


June 14, 2007 -- This is a view from the garage. The sewing room is at the end of the hallway. The laundry room is on the right.


June 15, 2007 -- An overall view of the Schuld Residence. The blue dumpster in the front is about 6 feet tall.


June 15, 2007 -- Tile is installed in the back powder room. It will be grouted in a day or so.


June 19, 2007 -- The porches get a thin coat of "mud" (concrete). Tile will be laid on the porches soon.


June 19, 2007 -- The first load of cabinets have arrived. They will be installed over the next few weeks.


June 20, 2007 -- This wooden ceiling is upstairs in the billiard room. It will also have beams when it is finished.


June 20, 2007 -- Cabinets are being installed in the sewing room.


June 20, 2007 -- The sewing room drawers are installed in this section.


June 20, 2007 -- Bathrooms are getting cabinets and mirrors.


June 22, 2007 -- Another load came from the cabinet shop. They built this arched doorway.


June 22, 2007 -- Tile surrounds are installed in the bathrooms. A row of decorative tile is also in place. The soap dish is taped in place – waiting for the cement to set.


June 22, 2007 -- This bathroom has dark cabinets and a dark medicine cabinet.


June 23, 2007 -- The master shower has tile surrounding it.


June 25, 2007 -- The kitchen cabinets are being installed.


June 25, 2007 -- This cabinet is in the sewing room (along with other cabinets in previous photos). One or two more truck loads of cabinets are due to arrive soon.


June 26, 2007 -- More cabinets are being installed. This one is in a bathroom upstairs.


June 26, 2007 -- Baseboard and window casing is finished. They are taped for more finish work.


June 26, 2007 -- This is another kitchen cabinet. The piece on the base is the bottom of the upper cabinet. You can see three lights on it.


June 26, 2007 -- The floor is down in the dining room. It has not been finished yet.


June 26, 2007 -- Cabinets are in a small bar area off the family room.


June 26, 2007 -- Wood is being placed in the hallway so cabinets can be installed.


June 27, 2007 -- The family room is getting random width flooring glued and nailed. The shiney material to the right of the new wood is glue.


June 27, 2007 -- Cabinets are going into the butler's pantry today.


June 28, 2007 -- More kitchen cabinets are being installed. The open hallway on the right goes to the elevator.


June 28, 2007 -- Cabinets are also being installed in the laundry room. The washer and dryer go on the solid black floor.


June 28, 2007 -- This cabinet is in a powder room near the garage entrance.


June 29, 2007 -- Oak flooring with walnut pegs is being installed in the study. It is random width lumber.


June 29, 2007 -- The butler's pantry cabinets are installed as is the floor. The room to the right of the photo is the dining room. To the left is the hallway and then kitchen.


June 29, 2007 -- These are kitchen cabinets. The red cabinets will be an island in the center of the kitchen.


June 29, 2007 -- Ceramic tile is being installed on the rear porch. It will be grouted after it is installed. This view is from the master bedroom. (You can see the master bedroom door on the left of the photo.)