Weiss Residence: December 2007
December 10, 2007 -- The rough in plumbing is finished. The bath tub has been installed in the upstairs bathroom. |
Click Here to return to Weiss Residence: December 2007
December 10, 2007 -- The rough in plumbing is finished. The bath tub has been installed in the upstairs bathroom. |