Campbell Residence: August 2007

![]() |
August 29, 2007 -- The second story floor joists are being installed. The joists are doubled up under the dormers and an upstairs wall. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: August 2007
![]() |
August 29, 2007 -- The second story floor joists are being installed. The joists are doubled up under the dormers and an upstairs wall. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |