Campbell Residence: September 2007

![]() |
September 10, 2007 -- Floor joists are being installed. The joists are 14" TJI engineered trusses. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: September 2007
![]() |
September 10, 2007 -- Floor joists are being installed. The joists are 14" TJI engineered trusses. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |