Campbell Residence: September 2007

![]() |
September 13, 2007 -- The exposed rafter tails are installed (correctly) on the workshop and storage room shed roof. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: September 2007
![]() |
September 13, 2007 -- The exposed rafter tails are installed (correctly) on the workshop and storage room shed roof. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |