Campbell Residence: September 2007

![]() |
September 26, 2007 -- The interior walls are braced to keep them straight, square and plumb. Once the sheathing is installed and the second floor system is in place, the bracing will be removed. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: September 2007