Campbell Residence: September 2007

![]() |
September 27, 2007 -- Second floor trusses are being lifted to the top of the walls. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: September 2007
![]() |
September 27, 2007 -- Second floor trusses are being lifted to the top of the walls. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |