Campbell Residence: October 2007

![]() |
October 9, 2007 -- The knee walls are built and much of the plywood sheathing is in place. The second floor walls will be built soon. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: October 2007
![]() |
October 9, 2007 -- The knee walls are built and much of the plywood sheathing is in place. The second floor walls will be built soon. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |