Campbell Residence: October 2007

![]() |
October 31, 2007 -- The roof is on and dried in over the master suite. The rear porch will be built next. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: October 2007
![]() |
October 31, 2007 -- The roof is on and dried in over the master suite. The rear porch will be built next. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |