Campbell Residence: November 2007

![]() |
November 1, 2007 -- The roof is on and plastic is covering the dormers. The dormer roof will be built as soon as the exposed rafter material arrives. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Campbell Residence: November 2007