Groman Residence: August 2008

![]() |
August 12, 2008 -- There are grade beams below the slab for extra support. The plumbing pipes will be sleeved before the grade beams are poured. An electrical box is in the background. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |