Groman Residence: September 2008

![]() |
September 19, 2008 -- The framing continues. With the exception of the four gable walls, the first floor walls are completed. Walls still have temporary bracing. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Groman Residence: September 2008