Groman Residence: September 2008

![]() |
September 23, 2008 -- Ceiling joists are being installed over the master bathroom. The posts for the center gables are in the distance. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Groman Residence: September 2008
![]() |
September 23, 2008 -- Ceiling joists are being installed over the master bathroom. The posts for the center gables are in the distance. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |