Groman Residence: October 2008

![]() |
October 7, 2008 -- The screened porch floor framing continues. The room on the right is the master bedroom. Windows will be installed in the close (right most) opening. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Groman Residence: October 2008