Groman Residence: October 2008

![]() |
October 10, 2008 -- The hip roof over the bathroom is being framed. The long wall (on the right) will have a window cut into it soon. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Groman Residence: October 2008
![]() |
October 10, 2008 -- The hip roof over the bathroom is being framed. The long wall (on the right) will have a window cut into it soon. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |