Groman Residence: January 2009

![]() |
January 13, 2009 -- The steam shower control is in place and connected. The shower door should be installed in the next day or two. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Groman Residence: January 2009
![]() |
January 13, 2009 -- The steam shower control is in place and connected. The shower door should be installed in the next day or two. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |