Lord Residence: January 2009

![]() |
January 20, 2009 -- The studio tub/shower unit was installed today. A wall and drywall will have to be built around it to finish it. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Lord Residence: January 2009
![]() |
January 20, 2009 -- The studio tub/shower unit was installed today. A wall and drywall will have to be built around it to finish it. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |