McNeil Log Cabin: November 2007

![]() |
November 30, 2007 -- Electrical rough in should be completed today. The breaker box is being installed in the laundry room. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to McNeil Log Cabin: November 2007
![]() |
November 30, 2007 -- Electrical rough in should be completed today. The breaker box is being installed in the laundry room. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |