Weiss Residence: October 2007
 |
October 11, 2007 -- The outdoor kitchen and pergola are being built. The will be filled with compacted material and have a concrete slab on them. The columns will be extended when the slabs are poured. |
 |
Click
Here to return to Weiss Residence: October 2007