Weiss Residence: October 2007

![]() |
October 17, 2007 -- The second floor joists are being installed. The rim joist is visible on the left half of the photo. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: October 2007
![]() |
October 17, 2007 -- The second floor joists are being installed. The rim joist is visible on the left half of the photo. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |