Weiss Residence: October 2007

![]() |
October 29, 2007 -- The roof sheathing is being installed. If you look closely, you can see a bay window over the front door. Dormers will be built on either side of the front gable. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: October 2007