b
Weiss Residence: November 2007

![]() |
November 20, 2007 -- The outdoor kitchen is being built. The smoker will be installed between these two brick faced walls. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: November 2007