Weiss Residence: January 2008

![]() |
January 29, 2008 -- Exterior trim has been installed on the east gable. The window will be installed when the roof pan is in place. Siding is also being installed on this gable. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: January 2008