Weiss Residence: February 2008

![]() |
February 14, 2008 -- Much of the front (river side) porch ceiling is installed. The electrical box near the top will be for a fan. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: February 2008
![]() |
February 14, 2008 -- Much of the front (river side) porch ceiling is installed. The electrical box near the top will be for a fan. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |