Weiss Residence: March 2008

![]() |
March 17, 2008 -- The pocket door tracks are installed. A transom will go above most of the downstair doors. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: March 2008
![]() |
March 17, 2008 -- The pocket door tracks are installed. A transom will go above most of the downstair doors. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |