Weiss Residence: April 2008

![]() |
April 2, 2008 -- The master shower is being tiled. The walls and ceiling are complete. The niche and window need trim tile. The floor tile is not down yet, either. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: April 2008







