Weiss Residence: April 2008

![]() |
April 9, 2008 -- The front (river side) steps are being prepared for treads. By the end of today, the treads will be installed. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: April 2008

![]() |
April 9, 2008 -- The front (river side) steps are being prepared for treads. By the end of today, the treads will be installed. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |