Weiss Residence: April 2008

![]() |
April 16, 2008 -- The side door deck has rails around the landing. The siding along the drip rail is also replaced. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: April 2008

![]() |
April 16, 2008 -- The side door deck has rails around the landing. The siding along the drip rail is also replaced. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |