Weiss Residence: May 2008

![]() |
May 9, 2008 -- The interior steps are continuing to be installed. There will be a railing along the wall from the bottom to the top. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: May 2008

![]() |
May 9, 2008 -- The interior steps are continuing to be installed. There will be a railing along the wall from the bottom to the top. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |