Weiss Residence: June 2008

![]() |
June 17, 2008 -- The master bath lights are installed and the faucets are installed. The pocket door is to be installed in a few days. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Click Here to return to Weiss Residence: June 2008
![]() |
June 17, 2008 -- The master bath lights are installed and the faucets are installed. The pocket door is to be installed in a few days. | ![]() |
![]() |
![]() |
![]() |
![]() |
![]() |