Residential Contractors

(843) 846 - 2500

Campbell Residence: September 2007

September 13, 2007 -- The plywood subfloor is installed on the floor system. The floor is being laid out today. You can see the sill plates standing on edge on the right edge of the photo.
Click Here to return to Campbell Residence: September 2007