Campbell Residence: September 2007
|
September 25, 2007 -- The first floor has plywood sheathing. The plywood is treated where the porches will be built. The top layer of plywood will tie the two stories together, so it cannot be installed yet. |
|
Click
Here to return to Campbell Residence: September 2007