Residential Contractors

(843) 846 - 2500

McNeil Log Cabin: November 2007

November 26, 2007 -- Wiring rough in has been done at the cabin. The box on the left is where the master bedroom light switches goes. The box near the center of the photo is for master bathroom switches. The lower box is for an outlet.
Click Here to return to McNeil Log Cabin: November 2007