McNeil Log Cabin: November 2007

Click on the photos to see an enlargement.



November 26, 2007 -- The interior is being stained a cherry color. You can clearly see the stained beams, logs and ceiling compared to the unstained logs (the lower few logs). The wire from the beam is for a light and/or fan.


November 26, 2007 -- Wiring rough in has been done at the cabin. The box on the left is where the master bedroom light switches goes. The box near the center of the photo is for master bathroom switches. The lower box is for an outlet.


November 26, 2007 -- The exterior stain was tested on this short wall. The cloth is to simulate what the chinking would look like. The stain is semi-transparent so knots and grain shows through it.


November 27, 2007 -- The interior is now stained. It also has a coat of sanding sealer on it. Today, it is being sanded.


November 27, 2007 -- The view out of one of the upstairs bedroom is very nice. The trees have lost many of their leaves and a lake in the distance is visible.


November 27, 2007 -- This is the master bedroom bay window. Of course, there is no interior trim installed yet. The stain brings out the richness of the logs.


November 29, 2007 -- The interior is stained and finished. The windows and doors are stained to match.


November 29, 2007 -- The outside staining has begun. It will continue today. The large boxes on the porch are bathtubs. They will be installed in the next few days.


November 30, 2007 -- The outside of the cabin is being stained. A color for the porch ceiling has not been decided yet. The exterior will need chinking in the grooves.


November 30, 2007 -- The front and left sides don't have stain on the first floor yet. It should be finished today.


November 30, 2007 -- Electrical rough in should be completed today. The breaker box is being installed in the laundry room.