McNeil Log Cabin: March 2008
March 31, 2008 -- The hand rails were built on Saturday. They will be stained to match the walls and beams. The stairs have temporary boards on them to protect them. |
Click Here to return to McNeil Log Cabin: March 2008
March 31, 2008 -- The hand rails were built on Saturday. They will be stained to match the walls and beams. The stairs have temporary boards on them to protect them. |