Weiss Residence: October 2007
|
October 3, 2007 -- The garage is ready to be poured except for the weather. There is a good chance of rain and that will damage the surface of fresh concrete. The metal "X" is two keyways to control the slab cracking. |
|
Click
Here to return to Weiss Residence: October 2007